New Energy Solutions

Safety of Electric Vehicle

In 2014, “National Joint Engineering Research Center” was settled down with Nanjing Golden dragon

The national R&D platform “National Joint Engineering Research Center” was settled down with Nanjing Golden dragon, which was devoted to create the world’s leading new energy automobiles, with performance of safety, reliability, economic, and environmental protection. The vehicle passed more than 20 severe tests, in terms of whole vehicle body, battery, motor, electrical control, to ensure safe driving.

Drawing of Vehicle Body Structure Safety

Technology of modular layout structure and lightweight ultrahigh strength steel sheet thermo-forming are adopted, with combination of CAD/CAE/CAM analysis, constraint system simulation analysis, virtual simulation, and calculation and experiment, integrated design platform and method of bus body and chassis structuring, helps to achieve the integration of vehicle structure optimization design and static & dynamic performance analysis, and vehicle lightweight structure design and manufacturing, which effectively reduces the vehicle energy consumption.

Protection Safety

Protection grade up to IP67, with high fording depth; design of perfect passive safety measures and intelligent battery power system, in case of fire, the battery compartment will quickly break off and the power cut off so as to prevent the deterioration of fire.

Strong reliability of five in one pure electric drive assembly

Integration of electric machine control, DC/DC, DC/AC, on-board charging, and high - voltage power distribution, make it with advantages of highly integration, overall arrangement, easy maintenance high vehicle protection level, and excellent cooling effect.

Battery Safety

The battery passed a number of destructive experiments: high temperature, short circuit, squeezing, soaking, overcharge, and puncture.

  • Single body squeezing

  • Module squeezing

  • Single body puncture

  • Module puncture

Warranty

5-year warranty and can be extended to 8 years. Single vehicle after passed the 30,000KM comprehensive road test and battery high temperature cycle test, the battery capacity reduces less than 10%. After 5,000 times of charge-discharge, the battery capacity is not less than 75%, that is to say, the life space can last for 8 years, helps to solve your worries about battery capacity.

Intelligent remote control, improvement of vehicle driving safety

Real time information monitoring, including vehicle running state, battery voltage and temperature, and accurate location of vehicles, helps to ensure optimum battery status, safety of vehicle system operation, and to assist the city bus system to accomplish traffic dispatching. With functions of custom rules alarm and expert-level diagnosis

Matching products

1、What are the features about power charge and battery replacement, and how to select?
Charging mode
DC
DC
portable charger
Power charge time
over 7M: 2-5h 7M以下:1.5hbelow 7M: 1.5h
over 7M: 1-3h; below 7 M: 0.5h
8-12h
Power network interface
Specialized 400-700V and 60KW DC charger connected to 380V commercial power
Specialized 400-700V and 120KW charger connected to 380V commercial power
3KW and 8KW optional and can be connected to 220V household power supply (only applicable for vehicles below 7M)
Charging interface
DC charger - 9 core charging gun (international)
DC charger - 9 core charging gun (international)
portable charger

Nanjing Golden dragon offers customized power charge and replacement solution

  • Nanjing Golden dragon station

    Combined with customer sites, operation characteristics, Nanjing Golden dragon provides overall charging infrastructure solutions including power distribution, power charge, monitoring, and capital construction and carries out construction, that is, to offer turn-key project service.。

  • Customers self construction of power charging station

    Nanjing Golden dragon provides professional customized power charging basic design solution according to customers’ demands, and assists the customers to complete the construction of power charging supporting facilities.

  • Third party construction of power charging station

    King Long power charging staff assists customers in terms of docking and debugging of charging technology.

Contrast of advantages and disadvantages

  • Advantages of power charging station

    With low initial capital investment, just need to supply matching charging pile according to vehicle quantity. Low requirements for charging site, current existing sites can be used to set up power charging station.

  • Disadvantages of power charging station

    Combined with customer site, operation characteristics, Nanjing Golden dragon provides overall charging infrastructure solutions including power distribution, power charge, monitoring, and capital construction and carries out construction, that is, to offer turn-key project service.

  • Advantages op Power replacement station

    Self-service purchase mode: equip matching quantity of batteries as per vehicle; the usage, management and proprietorship belongs to Party B, there will be battery purchase expense occurred.Battery leasing mode: batteries are supplied by State Grid and battery manufacturers, battery application is by way of leasing; the battery management and proprietorship belongs to State Grid or the battery manufacturers, this can greatly reduce the battery purchase cost.

  • Disadvantages of power replacement station

    Combined with customer site, operation characteristics, Nanjing Golden dragon provides overall charging infrastructure solutions including power distribution, power charge, monitoring, and capital construction and carries out construction, that is, to offer turn-key project service.


Power charging station construction system

  • Power charging system

    Charging piles are equipped according to vehicle model and quantity, and the power charging station to be planned.

    Related departments:

    1.State Grid, Transformer capacity expansion

    2.Design and construction of power supply,Qualification materials recognized by the power supply company are required.


  • Power distribution system

    Choose appropriate sites according to the quantity and model of charging piles, design the power distribution solution and work out the required power supply capacity.

  • Civil engineering system

    1.Rain shelter of charging piles

    2.Matched offices: rest room, monitor room, toilet, power distribution room, identification system, etc.

    Related departments:

    1.Construction of civil engineering system shall be carried out by professional qualified design and construction parties.

    2.In case property ownership certificate of the power charging station is required, please report to the local departments such as planning bureau and construction committee.

  • Monitoring system

    1.Monitoring of Vehicle information

    2.Monitoring of charging pile information

    3.Monitoring of protection information

  • Power charging system

    Charging piles are equipped according to vehicle model and quantity, and the power charging station to be planned.

  • Monitoring system

    1.Monitoring of Vehicle information

    2.Monitoring of charging pile information

    3.Monitoring of protection information

  • ower distribution system

    Choose appropriate sites according to the quantity and model of charging piles, design the power distribution solution and work out the required power supply capacity.

    Related departments:

    1.State Grid, Transformer capacity expansion

    2.Design and construction of power supply,Qualification materials recognized by the power supply company are required.


  • Civil engineering system

    1.Rain shelter of charging piles

    2.Matched offices: rest room, monitor room, toilet, power distribution room, identification system, etc.

    Related departments:

    1.Construction of civil engineering system shall be carried out by professional qualified design and construction parties.

    2.In case property ownership certificate of the power charging station is required, please report to the local departments such as planning bureau and construction committee.

Power replacement construction system

  • Power replacement system

    According to vehicle model and quantity:

    1.Match the quantity of power replacement station and robots

    2.Match the battery quantity

    3.Plan the area of power replacement station

    Related departments:

    1.State Grid, Transformer capacity expansion, power distribution box

    2.Land for power replacement station, Approved by the Land and Resources Bureau

    3Power replacement station to designed by: qualified design unit recognized by the State Grid

  • Power distribution system


    To provide matching transformer, distribution box, and cable wiring.


  • Civil Engineering System

    Power replacement station, vehicle travel route, house construction,Address: a series of supporting facilities including rest room, office, toilet, power distribution room, identification system, and so on.

    Related departments:

    Construction of civil engineering system shall be carried out by professional qualified design and construction parties.


  • Monitoring system

    1.Robot monitoring

    2.Monitoring of Vehicle information

    3.Monitoring of charging pile information

    4.Security Monitoring

  Thank you for your attention to kavo! In order to let you experience the intimate service of kaiwo automobile, please fill in the following information, our service center will provide you with the most detailed car purchase consulting service in the first time, at the same time, you will get the most comprehensive model information, the latest preferential activities information and other valuable free services.